The Titanic Building Belfast commenced building by May 2009 and finished building by March 2012, with the main architect being Eric Kuhne & Associates. The building cost of the development was £77 million, with the total cost being upwards of £100 million. The Resistant Multi-Pro XS board matches the specifications from the architect because it has durability and high fire protection offerings and the board also offered a breathable option with very low harmful dusts.